Connell
Brothers were commissioned to carry out the demolition of
redundant buildings at U.K.A.E.A. (United Kingdom Atomic
Energy Authority) at Harwell. The project works were executed
under the NEC Form of Contract.
The works comprised of the asbestos removal
and demolition of Buildings B361, B394 and B532, all of
which were located within the Nuclear Licenced Site.
All operatives employed on this project
had to obtain security clearance from U.K.A.E.A.C. (United
Kingdom Atomic Energy Authority Police).
Throughout the works, Connell Brothers
had to implement a strict regime of radiological monitoring
in conjunction with the U.K.A.E.A. Appointed Health Physics
Monitor. All demolition debris was monitored during the
demolition stages prior to being despatched for further
processing. Detailed method statements and risk assessments
were submitted for each phase of the works for approval
by U.K.A.E.A. and a permit to work system was implemented.
During the course of the works, the site
was inspected by the Health & Safety Executive. The
visiting inspector commended Connell Brothers’ safe
approach to the work, the selection of appropriate plant
and the standard of written Method Statements and Risk Assessments.
Building B394
The former electrical workshop, constructed from brick with
asbestos sheeted roof supported on steel trusses. The building
contained a basement equipped with a large degree of plant
and underground ducts. The building footprint had an area
of 1,350 square metres.
A strict regime of asbestos sheet removal
and radiological monitoring was also implemented during
this phase of the works.
Building B532
A 1960’s two-storey purpose built restaurant with
a plan area of 2,600 square metres. The building comprised
of a steel frame with block and curtain walling and a flat
felt roof.
Internally, the building comprised of a
large restaurant area with main and supplementary kitchens,
function room and offices.
During the course of the stripping out
works, additional asbestos material was discovered beneath
the timber flooring in the restaurant area. This necessitated
the entire area to be sealed off and asbestos materials
removed under controlled conditions.
Building B361
The former transport unit was steel framed and corrugated
asbestos clad with multi-pitch asbestos roofing. Constructed
in the 1950’s, as the site vehicle maintenance facility,
the building had a floor area of 6,600 square metres.
Small spots of radiological contamination
had been identified on the roof and a method statement was
developed to account for all asbestos sheeting to be removed
whole for further radiological monitoring at ground level.
Sheets which were monitored and designated as uncontaminated
were removed under special waste regulations to a licenced
tip facility. Sheeting classed as contaminated was removed
to a separate quarantine area for further decontamination
works.
Throughout the demolition of Building B361,
protective measures were put in place to protect the 600mm
diameter storm water sewer which ran the full length of
the building. CCTV surveys were carried out on the drain
prior to and after slab removal, with video tapes being
issued to the U.K.A.E.A. Project Manager.
All demolition debris arising from the
work was subjected to radiological monitoring prior to removal
off site. The hardstandings and foundations were also subjected
to monitoring and processed on site via the crushing plant,
prior to being used as fill for voids.
The works were completed without injury
any operatives or other site staff.
CASE