September 2003 saw Connell Brothers
commissioned by Land Securities to demolish Megabowl and
Busters Restaurant as part of the enabling works for the
redevelopment of White City Retail Park. Connell Brothers
were faced with numerous challenges during this project
which called for careful detailed planning and sequencing
of the works. White City Retail Park comprises of approximately
twelve retail units which continued to operate at full capacity
for the duration of the project. The retail park is a busy
development which experiences high levels of vehicular and
pedestrian traffic seven days a week. Coupled with this
was the close proximity of the Old Trafford Football Ground
which meant extremely heavy traffic on match days.
There were also three separate construction
projects running concurrently on site, thus arrangements
were made to ensure that a co-ordinated approach was adopted
to traffic management, segregation of the public from the
demolition/construction areas and security arrangements.
This was done through close liaison with all parties involved.
Careful consideration had to be given to the public and
site operatives prior to commencement on site. High specification
hoardings, signage and protection were implemented from
the out set.
With all preparatory works in place the
demolition began. The first stage of the demolition programme
was soft stripping which was conducted by CITB/NTDG trained
operatives working on mini diggers assisted with bobcat
skid steers. A type three asbestos survey had been commissioned
with negative results however Connell Brothers operatives
remained vigilant throughout the works.
Following the soft strip operatives working
from a cherry picker securely harnessed in then conducted
hot cutting of steel work where necessary in order to pre-weaken
the structure prior to the mechanical demolition.
With soft strip operations completed the
main structural demolition was conducted by Connell Brothers
specialist 360 high reach hydraulic excavator equipped with
rotating shear attachment.
Another challenge which faced Connell Brothers
was an existing electricity sub station located immediately
adjacent to Busters Restaurant. This was to be maintained
throughout the project. Carefully designed crash decking
was brought in by Connell Brothers in conjunction with Lyndon
scaffolding to ensure full protection during the demolition
works.
The Connell Management team on White City
called for regular Safety Audits of the site, weekly Tool
Box Talks with regards to safety, regular Method Statement
Induction courses for all Operatives on site, regular Progress
and Safety Meetings with Land Securities. Regular auditing
was undertaken to ensure that the Project Management procedures
were followed. The 8 week Project was completed on time
to the client’s full satisfaction with no injuries,
accidents, or incident to members of staff or the public,
thus allowing Connell Brothers to continue there exemplary
record in Health and Safety.
CASE
STUDIES - HOME
- EMAIL |